• 2 days EIA Paints Bearish Picture for Oil Market With Record Supply, Low Demand
  • 2 days EOG Drops $5.6B on Big Bet on the Utica
  • 2 days Refiners Cheer Good Start to U.S. Driving Season
  • 3 days Supertanker With Russian Oil Anchored Near China Could Signal Weak Demand
  • 3 days EU Set to Propose More Flexible 2040 Emissions Target
  • 3 days U.S. Ethane Exports Face Licensing Hurdles After China Lifts Tariffs
  • 3 days India’s Eastern Diesel Exports Jump to 4-Year High
  • 3 days Libya Arrests Three for Storming NOC Amid Threats to Oil Supply
  • 3 days U.S. Sanction Threat Prompts Iran Tankers to Go Dark
  • 3 days Colombia Oil Investments Could Hit $4.68 Billion in 2025
  • 3 days Oil Wins Big as Supreme Court Greenlights Utah Rail Line
  • 3 days Chinese Oil Refiners Boost Exports as Domestic Demand Disappoints
  • 3 days Kazakhstan Can’t Make Supermajors Cut Oil Production
  • 4 days Galp Expects New Field to Boost Its Production in Brazil by 40%
  • 4 days Libya’s Eastern Government Warns Of Force Majeure on Oil Ports and Fields
  • 4 days Saudi Arabia to Review Spending Priorities After Oil Price Slide
  • 4 days Japanese Utility Set to Sign LNG Supply Deal From U.S. Lake Charles Project
  • 4 days Shell Boost Stake in Nigerian Deepwater as TotalEnergies Exits Bonga Oilfield
  • 4 days Saudi Aramco to Keep Tapping Debt Market After $5-Billion Bond Sale
  • 4 days Chevron to Cut 800 Jobs in the Permian
  • 4 days Trump Cancels $3 Billion Solar Subsidy
  • 4 days Oil Bulls Cheer A US Inventories See Surprise Draw
  • 4 days Iran May Pause Enrichment for Nuke Rights, Thawed Funds
  • 4 days China May Ease Rare Earths Export Controls for EU Semiconductors
  • 5 days Russia Hints at Changing Oil Price Level in Its Budget Rule
  • 5 days Russia’s Crude Oil Export Revenues Hit Two-Year Low as Prices Dip
  • 5 days Australia Extends Lifespan of Iconic LNG Plant to 2070
  • 5 days Exxon to Sell French Business to Canadian Firm
  • 5 days Shipping Data: Sanctioned Tankers Involved in Russia-India Oil Trade
  • 5 days Trump Will Allow Chevron to Keep Venezuelan Assets
  • 5 days B.C. Port Seeks to Draw More Tanker Traffic
  • 5 days Refiners Expect Saudi Arabia to Cut Oil Price
  • 5 days Elon Musk Says Oil Is “Small-Time”
  • 5 days Rig Count Tanks, Oil Slumps—OPEC+ Says ‘Full Speed Ahead’
  • 5 days Wildfires Return to Canada’s Oil Heartland
  • 6 days Saudi Oil Giant Aramco Set to Issue at Least $500-Million Bond
  • 6 days Italy’s Industry Calls for Lower Energy Costs
  • 6 days Iraq Accelerates Solar Power Development
  • 6 days UAE Says OPEC+ Must Consider Rising Oil Demand
  • 6 days Norway’s Oil and Gas Investment Set for Record High in 2025

Soaring Costs Put New U.S. LNG Export Projects at Risk of Delays

Surging labor and construction costs are plaguing some major U.S. LNG export projects, threatening to delay new LNG supply to international markets.   

Wage growth since 2021, a shortage of skilled workers, and rising costs of materials with the inflation over the past three years have increased overall contractor costs for U.S. LNG export projects, analysts tell Reuters.

Wages for skilled workers have jumped by 20% since 2021, and in some cases contractors have had to pay a per diem rate to retain these workers, Travis Woods, president of Gulf Coast Industrial Group representing more than 1,500 contractors in Texas and Louisiana, told Reuters.   

In addition, engineering, procurement, and construction (EPC) contracts for new LNG export plants have jumped by up to 25% since 2021, according to consultancy Rapidan Energy Group.

In one of the biggest setbacks so far, Zachry Holdings, the contractor building Exxon and QatarEnergy’s Golden Pass LNG project, initiated a voluntary court-supervised Chapter 11 process in May and fired thousands of workers. Progress on the $10-billion LNG export project stalled. 

“As the project’s lead contractor, we have navigated significant challenges and disruptions stemming first from the COVID-19 pandemic and, more recently, international geopolitical issues,” chairman and CEO John Zachry said.  

“Because we have been unable to find a path forward, we have been forced to take action to protect our business. The process we are starting today provides us mechanisms to initiate a structured exit from the GPX project.”

Last week, Exxon and QatarEnergy asked a bankruptcy court to immediately remove Zachry Industrial from the project.

“Zachry has stopped performing its obligations under the EPC (engineering, procurement and construction) contract, fired thousands of workers, stopped paying its subcontractors and abandoned the Golden Pass project that it committed to building at a lump-sum fixed price,” Exxon and QatarEnergy said in a court filing carried by Reuters.

To share the burden of rising costs, some other U.S. LNG developers are welcoming foreign investors in their projects.

Last month, Abu Dhabu’s ADNOC bought an 11.7% stake in Phase 1 of NextDecade’s Rio Grande LNG export project in Texas, announcing its first strategic investment in the U.S. ADNOC has also signed a 20-year LNG offtake agreement from Rio Grande LNG Train 4 with NextDecade, subject to a final investment decision.

NextDecade has also secured an offtake deal from train 4 at Rio Grande LNG with Saudi oil giant Aramco under a 20-year preliminary agreement.

By Tsvetana Paraskova for Oilprice.com

More Top Reads From Oilprice.com:



Join the discussion | Back to homepage


ADVERTISEMENT


Leave a comment

Leave a comment

EXXON Mobil -0.35
Open57.81 Trading Vol.6.96M Previous Vol.241.7B
BUY 57.15
Sell 57.00
Oilprice - The No. 1 Source for Oil & Energy News