AWS IAD-103

The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.

Amazon: Drogheda II

Amazon is constructing a two-story data center spanning 28,566 square meters (307,400 square feet) at the Drogheda IDA Business & Technology Park.

Amazon: Bombing 3

This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).

Amazon: IAD-174

Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.

Amazon: New Carlisle, IN

Amazon AWS is building a $11bn data center campus in Indiana. Amazon acquired more than 600 acres of agricultural land around New Carlisle in St. Joseph County in 2023 using the shell company Razor5.

AWS IAD102

The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.

Amazon: 6655 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.

Amazon: Kutanegara

Amazon Web Services (AWS) operates a data center facility in the Kutanegara region of West Java, Indonesia.

Amazon: Sunbury, Ohio

Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.

Amazon: Becker, MN

Amazon Data Services has acquired 348 acres in Becker, Minnesota for $73.6 million to develop a data center project. The land was previously part of Xcel Energy Inc.'s Sherco Site.

Amazon: TTC Industrial Area

Amazon Data Services Pvt Ltd has sub-leased 4.51 lakh sq ft of plot in TTC industrial area in Bonsari in Airoli for a period of 15 years (starting in August 2023.)

Amazon: Elliot Campus, Mesa

Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.

Amazon: Swindon

Amazing Web Services' Swindon facility was previously occupied by Hewlett Packard. HP had operated two data centers on the site from the 1990s up until 2020, when the facilities were decommissioned.

Amazon: Huesca 2

In 2024, Amazon Web Services (AWS) announced an investment of 15,700 million euros in Aragon over the next decade.

AWS: Nokesville Road Campus

Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.

Amazon: 6675 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.

Amazon: 21680 Ridgetop Cir

Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.

Amazon: 77954 Cottonwood Bend

The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon: Gilroy Bldg 2

Amazon is planning to build a data center campus on a 56-acre plot along highway 101, between Leavesly Road and Gilman Road in the City of Gilroy, California.

Amazon: Echo Rd

Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.

Amazon: Clonshaugh Park Bldg B

AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.

Amazon: 6665 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.

Amazon: 45975 Nokes Blvd

Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.

Amazon: 3180 Beech DC1

Amazon Data Services bought 112 acres off Beech Road, slightly north of its first 68-acre New Albany campus, for $21.8 million on April 2020 from the city's real estate affiliate.

Amazon: Villanueva 2

In 2024, Amazon Web Services (AWS) announced an investment of 15,700 million euros in Aragon over the next decade.

Amazon: Dobbins Campus

Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).

Amazon: Desoto, TX

Amazon Web Services (AWS) operates a 30,000 square foot (2,790 sq m) data center located in DeSoto, outside Dallas, Texas.

Amazon: Gilroy, CA

Amazon is planning to build a data center campus on a 56-acre plot along highway 101, between Leavesly Road and Gilman Road in the City of Gilroy, California.

Amazon: Hermiston 4

The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon: IAD-164

Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.

AWS: Potomac DC2

Amazon is constructing a two-building campus in Virginia’s Stafford County. The campus consists of two data-center buildings planned on 50 acres off Old Potomac Church Road, near U.S. 1 and Stafford Hospital.

Amazon: IAD-98

Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).

Amazon: El Burgo 2

In 2024, Amazon Web Services (AWS) announced an investment of 15,700 million euros in Aragon over the next decade.

Amazon Hermiston, OR

Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon: Round Rock, TX

Amazon is planning to develop a data center in the Round Rock area of Austin, Texas. The site spans across 149 acres along County Road 172 and McNeil Road, north of State Highway 45.

Amazon: Hermiston 3

The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon: 46020 Manekin Plz

Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.

Amazon: 42139 Reeds Farm Lane

Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.

Amazon: IAD-163

Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.

AWS: Potomac Church Campus

Amazon is constructing a two-building campus in Virginia’s Stafford County. The campus consists of two data-center buildings planned on 50 acres off Old Potomac Church Road, near U.S. 1 and Stafford Hospital.

Amazon: 3180 Beech DC2

Amazon Data Services bought 112 acres off Beech Road, slightly north of its first 68-acre New Albany campus, for $21.8 million on April 2020 from the city's real estate affiliate.

Amazon: IAD-121

The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.

Amazon Didcot

The Amazon's two data center campus was built adjacent to the Didcot Power Station under the pseudonym Willow Developments LLC.

The single-story facility will span 8,692 sq m (94,000 sq ft), while the two-story one will take up 20,800 sqm (224,000 sq ft).

The company also plans to deploy 52 3-MVA diesel generators for backup power, four of which would be secondary backup generators. Two additional 1MVA generators were proposed for powering administrative sections of the sit

Amazon Clonshaugh Park

AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.

Amazon PDX109

The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration

Amazon PDX110

The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).

Amazon: Bombing 4

This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).

Amazon: HYD 122

The second building of Amazon's Pharma City campus is being built in two phases. The first phase was completed in 2022.

Amazon: Cyberjaya 1

AWS is building its first Malaysian data center facility at Persiaran APEC, Cyberjaya, in Selangor. The first project will be built out in multiple phases and will be overseen by the Sepang Municipal council.

Amazon: IAD-122

The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.

Amazon: Portage, IN

Amazon is building a new $87 million data center in Portage. The location is confirmed as the AmeriPlex at the Port business park north of Interstate 94 and south of the Port of Indiana-Burns Harbor on Lake Michigan.

Amazon: 6645 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.

AWS Olson Rd Campus

Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.

Amazon: HYD 101

The second building of Amazon's Fab City campus is being built in two phases. The first phase was completed in 2022.

Amazon: Bombing 2

This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).

AWS: Costas Campus

Amazon Web Services (AWS) plans to invest $10 billion to build two data center complexes at industrial parks in Madison County, an area just north of the state’s capital, Jackson.

Amazon: 21660 Ridgetop Cir

Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.

AWS PDX111

The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration

Amazon: Sukamahi

In 2021, Amazon Web Services (AWS) opened the AWS Asia Pacific (Jakarta) Region, located in Jakarta, Indonesia.

Amazon: Margamulya

Amazon Web Services (AWS) operates a data center facility in the Margamulya region of West Java, Indonesia.

Amazon: Ferris Road

Amazon is planning a $50m data center on a 13.2-hectare site at 54-80 Ferris Road, Cobblebank, about 40km west of Melbourne’s center.

AWS IAD 101

The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.

Amazon: Arlington

Amazon Web Services (AWS) is securing over 400 acres in Arlington, Oregon, for a future data center campus, adding to their existing Oregon data centers in Morrow and Umatilla counties.

Amazon AWS Data Center Photos

AWS Full Site Plan for Data Centre Campus in Mulhuddart
Source: Fingal County Council
The campus, if approved, could contain upto eight ASW data centres. The campus is located Northwest of Dublin
Proposed Locatino of Mulhddart Campus
Source: Fingal County Council

The campus, if approved, could contain upto eight ASW data centres. The campus is located Northwest of Dublin

Expected Water Usage for Mulhaddart Data Centre Campus
Source: AWS Document Supplied for Fingal County Council Approvals
Satellite View Next to IAD74
Source: Baxtel
AWS Facility IAD-73
Source: Baxtel
AWS Facility IAD-74
Source: Baxtel
One of three campuses in the US East (Ohio) Region
AWS's New Albany Campus (US East: Ohio)
Source: Baxtel

One of three campuses in the US East (Ohio) Region

IAD50, 60, and 71
Source: Baxtel
Santa Clara industrial building at 2305 Mission Blvd. IPI Partners acquired the building in December 2019 in Santa Clara, part of an intricate series of deals that also enabled an Amazon unit to le...
Santa Clara industrial building at 2305 Mission Blvd as of 2019
Source: Google Maps

Santa Clara industrial building at 2305 Mission Blvd. IPI Partners acquired the building in December 2019 in Santa Clara, part of an intricate series of deals that also enabled an Amazon unit to lease the property and gain an option to potentially buy the site at some point.

AWS is proposing to build 1.75 million sqft of data centers on the 100 acre lot
Source: Baxtel
Drone shot of Amazon's Haymarket data center campus
Source: Baxtel
Map of Amazon, Google, and Facebook in New Albany
Source: Baxtel
Plans for T5's facility in the Clonshaugh Business Park
Source: Baxtel
Rendering of the 1st building
Source: Baxtel
A rendering of the 2nd proposed AWS Meath data center
Source: MCA Architects
Amazon boundries for the Tnuvot project
Source: Dan Harel
Proposed AWS layout at the former Didcot Power Station
Source: Baxtel
Campus expansion plan next to the Susquehanna nuclear power plant
Source: Baxtel
An aerial rendering of the AWS Warrenton Data Center
Source: Bohler Engineering
Amazon's Lake Anna Tech Campus Site Plan
Source: Baxtel
Amazon Round Rock Data Center Sitemap
Source: Baxtel
Amazon Plans Data Center on Pickaway County Farmland
Source: Baxtel
A site map shows the boundaries of the AWS data center project along Beech and Miller roads in New Albany
Source: Baxtel
Rendering of AWS Mulhuddart Campus, Dublin
Source: AWS | Fingal County Council
Rendering of AWS Mulhuddart Campus, Dublin
Source: AWS | Fingal County Council
Rendering of AWS Mulhuddart Campus, Dublin
Source: AWS | Fingal County Council
Rendering of AWS Mulhuddart Campus, Dublin
Source: AWS | Fingal County Council
Rendering of AWS Mulhuddart Campus, Dublin
Source: AWS | Fingal County Council
Rendering of AWS Mulhuddart Campus, Dublin
Source: AWS | Fingal County Council
AWS Dublin Clonsdaugh Sitemap
Source: AWS | Dublin City Council
Amazon Cosner Tech Campus site plan at 4049 Massaponax Church Road
Source: Amazon
Amazon Cosner Tech Campus site plan
Source: Amazon
Amazon Summit Crossing Tech Campus site plan
Source: Amazon
Amazon Summit Crossing Tech Campus proposed site
Source: Amazon
The Carter's Store Tech Campus site map at 8432 Flippo Drive
Source: Amazon
Amazon acquires three data centers in Sterling, VA
Source: Google Maps
Amazon Powered Shell-Campus at Atlantic Boulevard in Sterling
Source: Baxtel
Amazon's Potomac Church Tech Center Sitemap
Source: Amazon Data Services
Amazon acquired site at 44150 Wade Drive in Chantilly
Source: Google Maps
Amazon Cosner Tech Campus site plan
Source: Amazon
Site for Amazon campus along Route 3 in Stevensburg, Northern Virginia
Source: Google Maps
Amazon Stevensburg Campus Sitemap
Source: Amazon Data Services
AWS Gilroy Data Center Site Plan
Source: Amazon
Village Place Technology Park Sitemap
Source: Village Place Technology Park
Amazon bought land near Independent Hill in Manassas, Virginia
Source: Google Maps
Amazon plans to build a data center campus next to the Manassas mall
Source: Prince William County Planning Commission
Layout of Amazon's planned data centers in Herndon
Source: Fairfax County
Rendering of Amazon's Drogheda Data Center Campus in Ireland
Source: Tunis Properties LLC | MCA Architects
Construction work is taking place on Amazon's New Carlisle Campus
Source: South Bend Tribune

Related News (See all)

Ready to Level up Your
Data Center Strategy?