[custom-twitter-feeds feed=6]

Status on 07/06/2025 at 6AM CEST
AGSI
  • EU 0.36
    572.96 TWh stored
    50.53% full
  • AT 0.28
    55.98 TWh stored
    55.83% full
  • BE -0.05
    5.99 TWh stored
    71.27% full
  • BG 0.54
    2.68 TWh stored
    38.22% full
  • HR 0.67
    1.77 TWh stored
    37.15% full
  • CZ 0.45
    23.98 TWh stored
    51.85% full
  • DK -0.02
    3.41 TWh stored
    34.88% full
  • FR 0.48
    72.87 TWh stored
    57.96% full
  • DE 0.36
    104.97 TWh stored
    42.44% full
  • HU 0.35
    32.26 TWh stored
    47.45% full
  • IT 0.38
    126.00 TWh stored
    62.21% full
  • LV 0.26
    10.01 TWh stored
    40.28% full
  • NL 0.39
    55.36 TWh stored
    38.38% full
  • PL 0.54
    18.52 TWh stored
    51.11% full
  • PT 0
    3.42 TWh stored
    95.89% full
  • RO 0.35
    15.32 TWh stored
    45.23% full
  • SK 0.33
    14.17 TWh stored
    40.28% full
  • ES 0.01
    26.22 TWh stored
    73.17% full
  • SE 0
    0.02 TWh stored
    20.54% full
  • NE 0.11
    26.58 TWh stored
    8.05% full
  • UA 0.13
    24.10 TWh stored
    7.52% full
  • GB* -0.65
    2.48 TWh stored
    25.14% full
ALSI
  • EU
    4521.7 GWh/d send-out
  • BE
    716.1 GWh/d send-out
  • HR
    80.6 GWh/d send-out
  • FI
    35 GWh/d send-out
  • FR
    854.2 GWh/d send-out
  • DE
    336 GWh/d send-out
  • GR
    0 GWh/d send-out
  • IT
    686.8 GWh/d send-out
  • LT
    82.3 GWh/d send-out
  • NL
    755.9 GWh/d send-out
  • PL
    253.9 GWh/d send-out
  • PT
    119.6 GWh/d send-out
  • ES
    601.4 GWh/d send-out
  • AI
    634.4 GWh/d send-out
  • ES*
    634.4 GWh/d send-out
IIP
  • Uniper Energy Storage GmbH
    Injection unavailability
    Planned
  • Equinor Strorage Deutschland GmbH
    Injection unavailability
    Planned
  • Uniper Energy Storage GmbH
    Injection unavailability
    Planned
  • TAQA Gas Storage B.V.
    Gas treatment plant unavailability
    Planned
  • TAQA Gas Storage B.V.
    Other unavailability
    Planned

EU storage facilities

164

in 20 countries. EU storages can hold 4 months of EU gas demand.

LNG terminals

29

LNG terminals imported a third
of EU gas demand in 2023.

Km of pipelines

205060

pipelines enable gas supply to 100 million households and thousands of companies.

Members

72

Our 72 members operate a well-connected, highly flexible critical energy infrastructure.

GIEAC2025 (1)
22nd GIE Annual Conference: Fueling Change, Securing Tomorrow

omorrow marks the official opening of the 22nd Annual Conference of Gas Infrastructure Europe (GIE) at the Marriott Hotel in Athens, Greece, hosted by DESFA, the Hellenic Natural Gas Transmission System Operator.

Screenshot 2025-05-22 114653
New Joint Position Paper on LNG Protocall Recommendations
GIE is pleased to share a new joint position paper, titled "𝗡𝗮𝘃𝗶𝗴𝗮𝘁𝗶𝗻𝗴 𝗧𝗼𝘄𝗮𝗿𝗱𝘀 𝟐𝟎𝟒𝟎: The Critical Role of the LNG Industry in Achieving the EU’s Climate Targets", highlighting the essential [...]
dreamstime_xxl_189672237
Commission Issues Opinion on ENNOH Statutory Documents – A Milestone Toward Formal Establishment

The European Commission has published its official Opinion (C/2025/2004) on the draft statutory documents of the European Network of Network Operators for Hydrogen (ENNOH). This represents a key step toward […]

GIE-BI~2
GIE Biomethane Study Launch | Biomethane in the EU: How Current Gas Infrastructure Can Drive Future Energy Solutions

Gas Infrastructure Europe (GIE) is pleased to invite you to the GIE Study Launch on Biomethane in the EU: How Current Gas Infrastructure Can Drive Future Energy Solutions. The event will take place […]